Skip to product information

www.gyanrachanatours.com

Edwards 100 Ton Ironworker 1 Phase, 230 Volt, PowerLink, Coper Notcher

$18929.50
Sale price  $18929.50 Regular price 
Description

Edwards 100 Ton Ironworker 1 Phase, 230 Volt, PowerLink, Coper NotcherDESCRIPTION This 100 Ton Ironworker provides optimal power and adaptability to handle any project with its 4 Workstations including a factory installed Coper Notcher. Compatible with 12 interchangeable Attachments and 17 Accessories to adapt the Ironworker to your needs. Vertical movement produces even pressure resulting in precise punching and shearing with minimal distortion that results in extended tooling life. Punches are easily changeable, long

Lifting speed 50 ft

Additional cups and bottles are available and add to the optionality (extra cups and bottles sold separately)

For lifting and transporting steel plates and structures from all positions (horizontal

Pro-ATV Series and Tow Pro Trailers

In Stock for Shipping Today

back-up and o-ring plunger sealing system

Service Parts RESIN PACKING MULTI-PACK

Clamping force ranging up to 40

Model P7580VL30X-1 HP/PH 7

hose so you can easily move around project sites and reach tall areas while on a ladder

and 1400psi

Base has holes for temporary or permanent installation

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Jul 13 - Jul 18

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products